Our DAF Water Systems Rentals
A Look Inside Our Shop
These photos show a DAF system under construction — the same 304SS construction, hopper-bottom geometry, horizontal pressurization system, and build quality your 2027 rental unit will deliver.
Reserve Your
2027 Rental
Dissolved Air Flotation System
Industrial wastewater treatment capacity — on your schedule, without capital commitment. Ship-ready DAF units, fully commissioned and engineered by Tenco Hydro. Secure your deployment window before we're fully booked.
2027 Unit — At a Glance
Pricing — All Rates Locked at Booking
Choose the term that fits your project. Every tier includes rate protection from booking through the full rental period — no 2027 price escalation.
- Maximum flexibility — cancel with 30 days notice
- Ideal for emergency response or pilot programs
- Best for uncertain timelines
- Rate locked from first month through term
- Best fit for seasonal operations & plant upgrades
- Priority scheduling for 2027 bookings
- Rate protected — no price escalation
- Full commissioning support included
- Maximum savings for multi-year projects
- Preferred unit selection
- Extended O&M support included
- Ideal for permanent capacity planning
Book Early. Save More.
Rental DAFs book 6–18 months in advance. Customers who wait until Q4 2026 often face availability gaps. Lock in your rate and unit today.
Prepay Bonus — Get 1 Month Free
Prepay 50% or more of a 6-month or longer booking and receive one full month added to your term at no charge — a $27,000–$30,000 value depending on your tier. Prepayment funds unit production, locks your rate, and guarantees your deployment window. The free month may be applied at any point during your rental term.
Requires 6+ month contract and 50% prepayment at booking. Free month added to contracted term. Cannot be combined with other discounts.
Build Partner Program
Customers who prepay 100% of a 6-month term upfront qualify for our exclusive Build Partner rate — the lowest pricing we offer, only possible because full prepayment directly funds construction.
As a Build Partner, your unit is configured to your process requirements — flow rate, controls package, and ancillary equipment — rather than a standard rental spec. What's pictured represents one configuration; yours may differ based on what best fits your application.
Build Partners also receive dedicated project support, nameplate recognition on the unit, and right of first refusal for 2028 — benefits open-market renters never access.
Ask about Build Partner pricing and our 4-milestone payment schedule option. Contact sales for full details.
↓ Download Build Partner DetailsFlexible Start Windows
Lock in your rate and unit now, with the ability to adjust your deployment date as your project schedule firms up. Build Partner bookings include a flexible start window so shifting timelines don't cost you your slot.
Start window terms vary by booking type. Contact sales for details.
What's Included
Full treatment capacity without the $500K+ purchase commitment. Every rental comes with these standard services from Tenco Hydro.
Rate Lock
Your rate is fixed at booking. No 2027 price escalation — ever. What you sign is what you pay through the full rental period.
No Capital Outlay
Full treatment capacity without the $500K+ purchase commitment. Preserve your capex for your core project.
Free 1-Day Startup
Every rental includes one full day of onsite commissioning and startup by a Tenco Hydro engineer, plus ongoing phone support — at no charge.
Logistics Available
Shipping, mobilization, and demobilization are available as coordinated paid services. We handle the logistics so you don't have to.
2027 Rental Unit
Built in our Sugar Grove, IL factory — the same 304SS construction, hopper-bottom geometry, and horizontal pressurization system in every unit we deploy.
| Parameter | Specification |
|---|---|
| Unit Part Number | DAF-RCH-060017-NN-304SS-304RC-NN-PHORIZ+P100-ASME-C3 +DACB, RCM, PD, ALM, SS-RECIRC, AP |
| DAF Tank | 6′ × 17′ Rectangular Hopper Bottom |
| Flow Rate | Up to 100 GPM · RCH-060017 |
| Material | 304 Stainless Steel — all wetted surfaces |
| Chain | 304SS Roller Chain |
| Pressurization | PHORIZ + P100 · Horizontal tank-mounted · 76–100 GPM · ASME Certified |
| Air Saturation | 87% efficiency |
| Controls | C3 — Standard DAF Controls · USA factory assembled & maintained |
| Air Management | Digital Air Control Board (DACB) — automated |
| Recycle Flow | RCM + SS-RECIRC recirculation assembly with flow meter |
| Diagnostics | PD + ALM · 2 PNP sensors · Horn, strobe & remote alarm |
| Access | Access Platform (AP) · USA maintained |
Add-On Codes Included
All units undergo a full Factory Acceptance Test (FAT) at our Sugar Grove, IL facility before deployment. Onsite commissioning, instrumentation checks, and startup support included with every rental.
How We Maintain It
For every DAF rental, we perform a comprehensive move-in and move-out inspection and maintenance process — ensuring every unit is deployment-ready before it leaves our facility.
Full Tank Cleaning
Complete cleaning of the tank and all internal components before and after every deployment.
Mechanical Inspection
Inspection and lubrication of all mechanical systems and common wear items — replacing anything worn or damaged.
Instrumentation Testing
Full testing of instrumentation and controls to confirm proper operation before re-deployment.
Structural & Electrical Check
Detailed check of all electrical and structural components. Any worn or damaged parts are repaired or replaced.
Ready to Secure Your
2027 Slot?
Contact us today — our team will confirm availability and send a formal rental proposal within 24 hours. 2027 slots are filling now.
↓ Download Full Rental Program PDFRental pricing does not include shipping, mobilization, demobilization, site preparation, utilities, permitting, or consumables; these are available as coordinated paid services. Free 1-day startup includes commissioning and operator orientation by a Tenco Hydro engineer at the delivery site. Minimum rental terms apply as stated. Rates apply to 2027 rental periods only. 50% prepay bonus requires deposit at time of booking confirmation; free month applied to contracted term. Tenco Hydro reserves the right to modify this offer with 30 days notice. Subject to unit availability.
