Lamella Clarifier
Uncompromising sedimentation efficiency
Our Lamella uses inclined plates to maximize settling surface area within a small footprint, allowing for rapid separation of solids from water. By accelerating the clarification process, these systems enhance treatment capacity while reducing land and chemical usage, making them an intelligent choice for high-throughput operations.
Configure Your Lamella Clarifier
Part #
LAM-[FLOW]-[MAT]-[PPD]-[PPM]-[IC]-[CTRL]
1
Design Flow Rate
▶
Select the design flow. Lamella clarifiers are sized at 0.5–1.5 GPM/sq ft SOR. Plate area and plan dimensions shown for reference.
F100
100 GPM — ~26 ft² — 4'×6.5'
Design flow 100 GPM; plate area ~26 ft²; plan ~4×6.5 ft; height ~10–14 ft
F150
150 GPM — ~39 ft² — 4'×10'
150 GPM; ~39 ft²; ~4×10 ft plan
F200 Standard
200 GPM — ~51 ft² — 4'×13'
200 GPM; ~51 ft²; ~4×13 ft plan
F250
250 GPM — ~64 ft² — 5'×13'
250 GPM; ~64 ft²; ~5×13 ft plan
F300
300 GPM — ~77 ft² — 5'×15.5'
300 GPM; ~77 ft²; ~5×15.5 ft plan
F350
350 GPM — ~90 ft² — 5'×18'
350 GPM; ~90 ft²; ~5×18 ft plan
F400
400 GPM — ~103 ft² — 6'×17'
400 GPM; ~103 ft²; ~6×17 ft plan
F450
450 GPM — ~116 ft² — 6'×19.5'
450 GPM; ~116 ft²; ~6×19.5 ft plan
F500
500 GPM — ~129 ft² — 6'×21.5'
500 GPM; ~129 ft²; ~6×21.5 ft plan
FCUST
Custom Flow Rate
Outside standard range; provide GPM and application for engineering review
2
Material of Construction
▶
CS
Carbon Steel
Carbon steel tank and structure
304SS Standard
304 Stainless Steel
Moderate corrosion environments
316SS
316 Stainless Steel
Chloride exposure / aggressive wastewater
3
Plate Pack Spacing
▶
Select plate spacing. 3-inch is the standard industrial sweet spot balancing performance and robustness.
PPD-2
2" Spacing — High Performance
Highest capacity per footprint; best for well-conditioned floc; higher fouling risk
PPD-3 Standard
3" Spacing — Standard Industrial
Balances performance and robustness; most common for industrial wastewater
PPD-4
4" Spacing — Heavy Duty
Most robust; least prone to plugging; best for variable or high-solids operations
PPD-CUST
Custom Plate Spacing
Non-standard; provide application details
4
Plate Pack Material
▶
PPM-PVC Standard
PVC Plates
Standard for most municipal and industrial applications
PPM-PP
Polypropylene Plates
Good chemical resistance; lightweight
PPM-FRP
FRP Plates
Structural and corrosion-resistant
PPM-SS
Stainless Steel Plates
High-temperature or aggressive chemical environments
5
Inlet Conditioning
▶
Select upstream conditioning scope.
IC-NN
No Upstream Conditioning
Direct feed to lamella; conditioning by others or not required
IC-FM
Flash Mix Only
Flash mixing 30–120 sec; even inlet flow dissipation
IC-FF Standard
Flash Mix + Flocculation
Full upstream conditioning; optimized plate performance
IC-CUST
Custom Conditioning
Non-standard scheme; specify requirements
6
Controls
▶
C0
No Controls
All motors for field wiring; no panel
C1
Basic Controls
Motor starters and HOA switches
C2 Standard
Level + Alarms
Level monitoring with alarm outputs
C3
PLC-Based Standard Automation
PLC with HMI; process interlocks; continuous operation
C4
Full Automation + Sludge Handling
C3 + sludge/scum pump controls, level-based cycling, pump protection
7
Accessories & Add-Ons (Optional)
▶
Select optional accessories. Multiple selections allowed.
Effluent & Sludge
EL1
Standard Effluent Launder
Basic effluent collection launder
EL2
Adjustable Weir Launder
Adjustable V-notch weir for flow balancing
CSTP
Sludge Transfer Pump
Underflow sludge transfer pump
LIT
Continuous Level + High Switch
Radar level transmitter and high level switch
Site & Safety
DS
Inlet Debris Strainer
Debris strainer on lamella inlet
AP
Access Platform
Operator access platform with handrails
Services
Install
Installation Services
Tenco Hydro installation services
Configuration Summary
Design Flow—
Material—
Plate Spacing—
Plate Material—
Inlet Conditioning—
Controls—
AccessoriesNone
0 of 6 configured
Part Number Format
LAMSeries prefix
[FLOW]Design flow range
[MAT]Material of construction
[PPD]Plate pack spacing
[PPM]Plate pack material
[IC]Inlet conditioning
[CTRL]Controls tier
+[ACC]Accessories (optional)
Ready to Quote?
Send your completed part number to Tenco Hydro. Budgetary pricing within 2–3 business days.
Request a Quote
Engineers Respond Within 2 Business Hours
Complete the configurator above to auto-fill your part number, then describe your application below.
📞
Phone
📍
Location
720 N Heartland Dr Unit K
Sugar Grove, IL 60554
Sugar Grove, IL 60554
🕐
Hours
Mon–Fri, 7:00 AM – 5:00 PM CT
🏭
Specialties
304/316SS welding · ASME stamping
PE stamps all 50 states · In-house fabrication
PE stamps all 50 states · In-house fabrication
✅
Request Received!
A Tenco Hydro engineer will follow up within 2 business hours.
Questions? Call 708-387-0700.