Wastewater Room Builder

Size & Select Your Main Components. Detailed BOM Configuration Available

Wastewater Room Designer — Tenco Hydro
Wastewater Room Designer
1 — Industry & Flow
2 — Treatment Train
3 — Summary & Quote
What Industry Are You In?
Your industry determines the recommended treatment chain. You'll be able to modify it in the next step.
What's Your Flow Rate?
Enter your peak design flow rate in gallons per minute. Use the estimator if you're not sure — or click "I don't know" to flag it for our engineers.

Design Flow Rate

This sets sizing for every component in your system.

GPM
⚡ Flow Rate Estimator
Shifts per day
Production size
Water intensity
Estimated flow: calculating…

Your Recommended Treatment Train

Based on your industry and flow rate. Toggle components on/off, add from the library, and click any block to configure it.

Industry:
Flow:
⠿ Drag blocks to reorder your treatment train

↺ Recirculation Lines

Your Wastewater Room Summary

This summary is based on your responses. A Tenco Hydro engineer will review and refine the specification during quoting.

✓ System configured — ready for quoting
# Component Key Specifications Status Detail Config

What Would You Like to Do Next?

You've completed your wastewater room design. Choose how you'd like to proceed — get a quick quote, or dive deeper into each component's full specification.

📋
Request a Quote
Send this system summary to our engineering team. We'll review, size, and price each component. Turnaround: 2–3 business days.
⚙️
Configure Each Component
Go deep on each component using Tenco Hydro's full configurators — generate detailed part numbers before requesting your quote.
Configure Component
Tenco Hydro · 720 N Heartland Dr Unit K, Sugar Grove, IL 60554 · Wastewater Room Designer · Made in USA